Integrated Pest Management and Good Agricultural Practices

Integrated Pest Management (IPM) and Good Agricultural Practices (GAP)

Understanding the Action Threshold in Pest Management

The action threshold, also known as the economic threshold (ET) in the European Union (EU), is generally defined as the pest population density at which a producer must initiate control action to prevent the population from exceeding the Economic Injury Level (EIL) in the future. This implies a delay between estimating the pest density through monitoring and implementing control

Read More

Year-End Accounting Adjustments & SME Accounting Plan

Accounting Adjustment Process and Year-End

A company’s activity is divided into cycles or time units called economic periods. These cycles can vary in length, but are usually established on an annual basis to coincide with the calendar year, i.e., each fiscal year begins on January 1st and ends on December 31st.

At the end of each fiscal year, the company calculates its activity to determine its precise profit or loss and financial position. These data form the basis for business analysis and planning

Read More

Control Systems: Analysis, Design, and Applications

Controllability of Linear Systems

Controllability of a linear system, in both continuous and discrete time. A continuous-time system is controllable if, for any initial state and some finite time, there exists a control that transfers the state to a desired value. A discrete-time system is controllable if, for any initial state and some finite time, there exists a control sequence that transfers the state to a desired value. There are several tests for controllability.

Controllability of Time-Invariant

Read More

Nick Darusman: Electrical Engineer – Telecom & IT Skills

2Q==

C
URRICULUM
V
ITAE

Personal Detail

  • Full Name

Nick Darusman

  • Place / Date of Birth

Banda Aceh / January 9th 1989

  • Gender

Male

  • Marital Status

Single

  • Nationality

Indonesian

  • Present Address

Jl. Kali Kepiting Jaya II No. 35, Surabaya 60132

  • Permanent Address

Jl. Prada Utama Komp. Kehakiman No. 1 Lamgugob, Banda Aceh 23115

  • Mobile Phone

+6285278354320

  • Email

ico_retro@yahoo.com

Formal Educations

Education

  • 2009 – 2012 Bachelor Degree (S1) at Institut Teknologi Sepuluh Nopember, Surabaya, East Java

    • Major: Electrical Engineering
    • Final Project: Analysis and Modeling of The Crowd
Read More

DMAIC & DMADV in Six Sigma: Optimizing Processes & Products

DMAIC & DMADV in Six Sigma: Optimizing Processes & Products

DMAIC is a structured problem-solving and process improvement methodology used in Six Sigma. The acronym DMAIC stands for Define, Measure, Analyze, Improve, and Control. This approach is widely employed to enhance processes, reduce defects, and improve overall business performance. Let’s delve into each phase of DMAIC:

Define

  • Objective: Clearly define the problem or the improvement opportunity. Understand the project’s goals and scope.
Read More

Social Problem Analysis and Project Development with Logical Framework

Understanding Social Problems and Project Development

Root Causes of Social Issues

Social problems often stem from three interconnected factors:

  • Low education levels: This can be attributed to factors like school dropout rates and low academic achievement.
  • High rates of family poverty: Poverty limits access to resources and opportunities, perpetuating a cycle of disadvantage.
  • High rates of youth drug abuse: Substance abuse among young people can lead to various social and personal problems.

These factors

Read More