Operations Management and Logistics Practice Exam

Operations Management Practice Questions

  1. Regarding the link method, FALSE: b) A link with low traffic
  2. Regarding the following state inventories, FALSE: b) The ability to obtain economic advantages
  3. In a simple attribute sampling plan: c) The batch is rejected/inspected
  4. The railway terminals, seaport/road transport: a) Dry port
  5. A company employs 5 workers, 225 days, 90%: c) The annual unproductive 2700
  6. Per-project configuration: c) Each product or service is unique and complex
  7. When using Kanban: d) It allows reduced inventory and detects stock-related problems
  8. The production trees: a) NB(A): 280, 510, 400, 60, 0, 0
  9. For component B of the previous: a) NN(B): 0, 300, 390, 50, 0, 0
  10. MRP II extension of MRP I: c) An integration of strategic planning
  11. The Quality TC: d) It is the sum for determined items plus the inspection and prevention
  12. Decisions regarding preventive maintenance for machines: c) Operational
  13. The main objective of operational scheduling: b) Determine which operations are performed
  14. The weighted position ranking technique: c) Lineal distribution
  15. According to the TOC: d) All answers correct
  16. The 18-month planning in months: b) Aggregate production plan
  17. Batch configuration: c) Stop to prepare
  18. In JIT, in total productive maintenance: c) Workers participate in prevention
  19. How many units, 10 min, 250 days, 8h: b) 12,000 units
  20. If the manufacturing sequence of 3 items, A-G: a) B-C-A-C’-D-F-E-G
  21. Which of the following statements is CORRECT regarding histograms: c) Shows the frequency distribution
  22. Regarding the surface, TRUE: d) To obtain it, the coefficient 0.05-3
  23. A stockout or stock breakage: d) All above true
  24. In relation to logistics in a company, FALSE: d) It involves an aggressive strategy
  25. The only 2 components of internal supply: b) Preparation time in the workplace
  26. The time between finalization of a product and the next: c) Cycle time
  27. Applying Johnson’s algorithm for 2 machines B-C-D-E-A: a) 24
  28. The concept TOTAL QUALITY: d) None above correct
  29. The lot sizing technique, Net requirements: a) Silver-Meal
  30. Regarding continuous improvement, CORRECT: c) It is a constant and systematic process
  31. In stock management, a proportional cost: c) Stockout or stock breakage
  32. What is the main objective of PDCA: b) Continuously improve processes
  33. Regarding the assignment of elements, CORRECT: d) All correct
  34. The diameter of 100 screws, 6.91, 7.29: c) 0.04 mm
  35. Pareto’s 80/20 law states: b) 80% of problems come from 20% of causes
  36. Regarding idle time, temporary adjustment: a) It avoids the negative effects
  37. An automobile assembly: c) Synthetic industry
  38. From the outputs of MRP II: c) Cost calculation and financial statements
  39. As a production system, JIT: b) A highly flexible pull-type system
  40. “Dispatch” in production planning: b) Deliver work order to operational area
  41. A company has 2 warehouses, k=2, CORRECT: d) The warehouse surface 10m
  42. What JIT technique reduces machine setup: a) SMED
  43. If the production requirement, March 6500: b) If there is an initial stock 600, final 100
  44. To make a control chart: c) From 100 to 150 elements, groups of 4/5
  45. According to TOC, NON-bottleneck: c) Adapt its production rate
  46. An advantage of functional distribution: d) Task diversity reduces monotony
  47. From the perspective of SDG 12, “fast fashion”, CORRECT: b) It is an unsustainable model
  48. In autonomous defect, Jidoka: d) All above correct

Single Evaluation

  1. One of the characteristics of JIT: a) Promote long-term collaboration
  2. The time cubes, MPS: a) Weeks
  3. The cost of possession (holding costs): a) It is proportional to stock
  4. Which of the following is NOT a service company: c) Most services postpone production
  5. Regarding the planning horizon MPS: d) All above correct
  6. In autonomous defect (automation), Jidoka: d) All above correct
  7. The sizing technique, lowest total cost: a) Silver-Meal
  8. Of the following components of internal supply: c) Preparation time
  9. A company, 52eur, 65eur, 0.8h: a) Overtime
  10. From component C: c) 10 units
  11. The diagram that allows off-center analysis: c) Histogram
  12. In relation to Pareto: a) The few causes 20%, defects 80%
  13. An advantage of Kanban: d) All above correct
  14. If the static, 150m, 50m, k3, FALSE: d) The total area 800
  15. AIP company: c) A-F-G-C-B-E-D
  16. These are aspects of good distribution: d) All above correct
  17. The XYZ company solar panels: a) The 2 vital causes 83%
  18. Among the objectives of good plant layout: b) To increase maintenance
  19. A company dedicated to metal components: b) M4
  20. In the case of service companies: c) Idle times
  21. As for process-based distribution: a) It is very flexible
  22. A company wants: b) 12 minutes
  23. After balancing, CORRECT: b) The actual efficiency 93-75%
  24. About reverse logistics: d) All above correct
  25. About soikufu: c) It is a program for continuous improvement