Environmental Responsibility in Architecture: Case Studies in the Dominican Republic

Daynes E. Oscar (2018-6251)

Feb. 05, 2020

Environmental Responsibilities of the Architect

Case Study Analysis: Facts surrounding the case of the extension of Anacaona Avenue &

construction of a hotel in Cotubanama Park, identifying the issue in relation to the Code

of Ethics and Professional Conduct, finding an alternative courses of action and choosing

the best course of action.

Architecture is defined as the art of design and construction of structures with the

purpose of improving the life experience of humanity. These structures take up space and

describe the collective memory of a society. This career is very important because it directly

affects the environment, so we are responsible for finding the solution of living in a

beautiful and sustainable way. Because architecture is considered an art, it may seem that it

does not have a code of ethics like other sciences, such as medicine, psychology, law or

business. However, the architect has to be a highly educated and disciplined person in the

career because this defines his principles as a person.

The extension of Anacaona Avenue and the construction of a resort on

Cotubanama Park have been of the most controversial topics in our news. These two cases

tell a lot about where the principles of our profession lie. The American Institute of

Architects states the Code of Ethics and Professional Conduct. They arrange their

statements in three tiers: Canons, Ethical Standards and Rules of Conduct. Through these

US guidelines I will analyze two recent national issues that put in question the principles of

the architects involved.

CANON VI talks about the obligation of the architect to the environment.

Members must recognize the professional responsibilities of promoting sustainable design

and development in the natural and built environments and design that are energy and

resources conscious. Estatement 6.4 says:

” 6.4 Ecosystems. Members should consider with their clients the impact of each

project on the natural habitat and ecosystem to promote environmental and human health.”

This means that it’s our responsibility to make aware of the impact of a decision of

our client. It doesn’t matter the economic benefits we’ll receive from this, everything can

impact our surroundings.

A situation to which we can apply this is the construction of a hotel in a Dominican

Natural Reserve. In 420 square kilometers of this land, you can find 484 species of native

flora, 53 endemic to the island and 35 introduced; more than 200 species of animals,

including reptile mammals, insects, amphibians and birds. Even though the company

involved in this situation is not Dominican, the architects behind the design should

understand the negative impact it would have on the environment in our land. Not only

the designers are worthy of judgement, but the dominican environment ministry. They are

the ones that permitted the deforestation of approximately 245,000 sq meters.

Another situation that hinders the ecosystem was the extension of Anacaona

Avenue. The architect and urban planner Eduardo Selman agrees that the only solution to

the traffic problem on Anacaona Avenue is to take ten meters away off the Mirador Sur

park, as Eugenio Pérez Montás (responsible of the “solution”). Again, this goes against our

purpose as architects. For those who go through the daily struggle of going to work taking

this avenue this solution would be ideal; however, they don’t understand the humongous

impact it will have for those who live in the surrounding of the park and the whole capital.

Parque Mirador Sur is considered the “lung of Santo Domingo”, is the one that helps

breathe cleaner air. Although it is a solution to a problem (which is one of the purposes and

the designer), tt is not certain that the extension of Anacaona would alleviate traffic of the

long run.

This brings me to another statement of the Code of Ethics.

“ 6.5 Climate Change. Members should incorporate adaptation strategies with

their clients to anticipate extreme weather events and minimize adverse effects on the

environment, economy and public health. ” This means that if incase of not cancelling or

removing the project, we should cause as little impact to the environment as possible.

Thank goodness that these two situations have been or are being assessed. The

problem in this country is that we let things happen, then regret and try to find this

solution without learning from the failure. The extension of Anacaona never concluded

because of the voice of the people; nevertheless, Cotubanama has already lost many square

meters of animal habitat. Even though the project has been canceled, the consequences are

yet to come.