Cost Comparison of Manufacturing Methods and Process Sequences

Economic Comparison of Aluminium and Steel Castings

In the design of a jet-engine part, either an aluminium alloy casting or a steel casting can be specified because both materials provide equal service. The aluminium casting weighs 1.2 kg and costs ₹80 per kg for casting, while the steel casting weighs 1.35 kg and costs ₹35 per kg. Machining costs are ₹150 per unit for aluminium and ₹170 per unit for steel. Every kilogram of excess weight carries a penalty of ₹1,300 because of increased fuel consumption. Determine which material should be specified and find the economic advantage per unit.

Also given:

  • Weight: Aluminium 1.20 kg, Steel 1.35 kg
  • Casting cost: Aluminium ₹80/kg, Steel ₹35/kg
  • Machining cost: Aluminium ₹150/unit, Steel ₹170/unit
  • Excess-weight penalty: ₹1,300/kg (applies to steel)

Step 1: Calculate Aluminium Casting Cost

Material cost = 1.20 × ₹80 = ₹96
Machining cost = ₹150
Total aluminium cost = ₹96 + ₹150 = ₹246

Aluminium is the lighter material, so no excess-weight penalty is applied to aluminium.

Step 2: Calculate Steel Casting Cost

Material cost = 1.35 × ₹35 = ₹47.25
Machining cost = ₹170
Excess weight = 1.35 − 1.20 = 0.15 kg
Weight penalty = 0.15 × ₹1,300 = ₹195
Total steel cost = ₹47.25 + ₹170 + ₹195 = ₹412.25

Step 3: Economic Advantage

Economic advantage of aluminium = Steel cost − Aluminium cost
= ₹412.25 − ₹246 = ₹166.25 per unit

Conclusion: An aluminium alloy casting should be specified. Economic advantage = ₹166.25 per unit.

Cost Comparison of Dining Table Alternatives

A company manufactures dining tables consisting mainly of a wooden frame and a table top. Alternative A uses a wooden frame with a Sunmica-finished top, while Alternative B uses a wooden frame with a granite top. The quantities, material rates and labour requirements for both alternatives are given in the table. Calculate the manufacturing cost of each alternative, identify the more economical alternative, and determine its economic advantage.

Alternative A: Wood Frame with Sunmica Top

ItemQuantityRateAmount
Wood for frame and legs0.10 m³₹12,000/m³₹1,200
Table top with Sunmica finish1₹3,000₹3,000
Leg bushes4₹10/bush₹40
Nails100 g = 0.10 kg₹300/kg₹30
Total labour15 hr₹50/hr₹750

Total cost of Alternative A = 1,200 + 3,000 + 40 + 30 + 750 = ₹5,020

Alternative B: Wood Frame with Granite Top

ItemQuantityRateAmount
Wood for frame and legs0.15 m³₹12,000/m³₹1,800
Granite table top1.62 m²₹800/m²₹1,296
Leg bushes4₹25/bush₹100
Nails50 g = 0.05 kg₹300/kg₹15
Total labour8 hr₹50/hr₹400

Total cost of Alternative B = 1,800 + 1,296 + 100 + 15 + 400 = ₹3,611

Step 3: Compare the Two Alternatives

Economic advantage = Cost of A − Cost of B = ₹5,020 − ₹3,611 = ₹1,409 per table

Conclusion: Alternative B (wood frame with granite top) has the lower manufacturing cost. Economic advantage = ₹1,409 per table.

Selecting the Most Economical Process Sequence

A process-planning engineer has proposed three possible sequences for manufacturing a component: (1) Turning → Milling → Shaping → Drilling, (2) Turning → Milling → Drilling, and (3) performing all operations using a CNC machine. The machine-hour rates and processing times for the alternatives are provided in the table. Determine the most economical process sequence.

Given Data

OperationMachine rate (₹/hr)Seq. 1 (min)Seq. 2 (min)Seq. 3 (min)
Turning20055–
Milling400814–
Shaping35010––
Drilling30033–
CNC operations1000––8

Operation cost = Machine-hour rate × Processing time (minutes) / 60

Sequence 1: Turning → Milling → Shaping → Drilling

Turning = 200 × 5/60 = ₹16.67
Milling = 400 × 8/60 = ₹53.33
Shaping = 350 × 10/60 = ₹58.33
Drilling = 300 × 3/60 = ₹15.00
Total Sequence 1 = ₹143.33

Sequence 2: Turning → Milling → Drilling

Turning = 200 × 5/60 = ₹16.67
Milling = 400 × 14/60 = ₹93.33
Drilling = 300 × 3/60 = ₹15.00
Total Sequence 2 = ₹125.00

Sequence 3: All Operations on CNC Machine

CNC cost = 1,000 × 8/60 = ₹133.33
Total Sequence 3 = ₹133.33

Comparison

Process sequenceTotal cost per component
Sequence 1₹143.33
Sequence 2₹125.00
Sequence 3₹133.33

Conclusion: Sequence 2 (Turning → Milling → Drilling) is the most economical, with a cost of ₹125.00 per component.

Revised Process Sequence Cost Analysis

A process-planning engineer has listed three possible operation sequences for producing a component: (1) Turning → Milling → Shaping → Drilling, (2) Turning → Milling → Drilling, and (3) performing all operations using a CNC machine. The table provides the machine-hour rates and processing times for each operation and sequence. Determine the most economical sequence of operations to manufacture the component.

Given Data

OperationRate (₹/hr)Seq. 1 (min)Seq. 2 (min)Seq. 3 (min)
Turning30088–
Milling350814–
Shaping38010––
Drilling35055–
CNC operation1200––10

Operation cost = Machine-hour rate × Processing time (minutes) / 60

Sequence 1: Turning → Milling → Shaping → Drilling

Turning = 300 × 8/60 = ₹40.00
Milling = 350 × 8/60 = ₹46.67
Shaping = 380 × 10/60 = ₹63.33
Drilling = 350 × 5/60 = ₹29.17
Total Sequence 1 = ₹179.17

Sequence 2: Turning → Milling → Drilling

Turning = 300 × 8/60 = ₹40.00
Milling = 350 × 14/60 = ₹81.67
Drilling = 350 × 5/60 = ₹29.17
Total Sequence 2 = ₹150.84

Sequence 3: All Operations on CNC Machine

CNC cost = 1,200 × 10/60 = ₹200.00
Total Sequence 3 = ₹200.00

Comparison

Process sequenceTotal cost per component
Sequence 1₹179.17
Sequence 2₹150.84
Sequence 3₹200.00

Conclusion: Sequence 2 (Turning → Milling → Drilling) is the most economical, with a cost of approximately ₹150.84 per component.